




Shaping Up ... the interior is coming together this week with most of the cabinets now installed. Take a peek and see the progress.



in all the plugs and switches. The big decision yesterday was almond or white switch/plug plates. I've opted for white (glad that decision is over :) The garage walls should be getting taped and textured soon. Today I've been searching for a rustic log for the fireplace mantel in the basement ... I think the example shown is what will be ordered. It's made from white cedar and is similar to what dh mentioned he liked. This morning I had the nerve to go shopping for living room couches. Hope dh approves ... he did mention leather. I'm picky about leather
and prefer the type that looks better with age, scratches, spills, etc. A less processed leather that is pretty indestructible with kids and ages well after time and use. It's been a busy but productive week. Looking like our home instead of just a bunch of pencil drawings on napkins


















With the exception of the front steps leading to the porch, the framers are finished ... they even cleaned up their MESS inside. There were empty pop and coffee containers everywhere, along with tons of sawdust (no, not the pooch)! The piece of machinery in front of the garage windows is being used to build a basalt rock retaining wall for the porch step landing. There will be the same rocks used in the back for a low... but rather long retaining wall. The interior walls are marked for the whole-house vacuum system. Thursday and Friday the actual electric and gas meters were installed on the outside garage wall. ... I guess this coming week more electrical and duct work will be done and probably the beginning of sheet rocking the inside walls. This picture was taken Thursday when we had a light dusting of snow. Since then, the temps have warmed up and our snow has turned to rain. We've dubbed our home the Mangy Moose Lodge!









